The bathroom is a room with special conditions: high humidity, temperature differences. That is why making fixes in the restroom, you should definitely plan the whole working process, to think about the sequence of measures to be achieved. Within this article, you will learn the way to start the repair in the restroom and what types of work ought to be performed together with your hands. Step-by-step instructions for toilet repair

Stage 1: drawing up a strategy and choosing a layout vsyakuhnya.ru solution.

Fix in the toilet can be of 2 types:

  • Unplanned, spontaneous, arising from the can of unexpected conditions. As an example, in the event of an pipe burst, flooding by neighbors.
  • Planned, which can be either cosmetic or capital. It requires preparation, serious fiscal investment and time.

Begin repairs at the bathroom is to ascertain the design, inside. Think through to the last detail, what’s going to be the room, choose a color. Pastel colors are conventional, in addition to a mix of blue and blue, black or cherry with beige.

Begin repairs at the bathroom is to determine the design, interior design. Think in detail, what’s going to be the space, pick a colour. Pastel colors are thought to be traditional, as well as a combo of colours.

The next point is the option of facing material. Generally, finishing in the bathroom is done with vinyl, porcelain tiles, mosaic, plastic panels. Check the plumbing, whether it ought to be mended. If necessary, select the right alternative. Proceed to the measuring work: step all sides, figure out the area of the room. Based on these data, we mark the location of the plumbing fixtures.

Measure 2: the choice of sanitary fittings and substance for finishing.

It’s very important to see that the purchase price of sanitary ware precedes the preparation stage, rather than vice versa. This means that first we develop a design project, make a plan, and then go to the store. Another point – you should specify the size of your favorite plumbing fittings and examine the plan, whether it fits.

It is important to see that the cost of plumbing fixtures is preceded by a preparation phase, rather than vice versa. This usually means that first we create a new design project, make a plan, and then go to the store. Another one

In terms of materials for completing, it is preferable to buy them immediately for the entire repair cycle, so that you will not be distracted if something has been missing. Do not forget about preparing the essential tools.

Measure 3: dismantling plumbing and tiling.

After All of the preliminary work is completed, proceed to the Start of the work process:

  • Remove the sink and tub from the area, even though they will not be replaced with new ones. In this way, you can keep them clean and undamaged.
  • Remove the old tile, cleaning after it all surfaces: ceiling, walls, flooring.
  • Remove paint from the walls, if they had been formerly painted, as the glue solution or a new layer of paint will not adhere to the surface.

Measure 4: Cost of communications: pipes, electrical wiring.

Very often in an older home, you should carefully inspect and replace not only the pipes that are in the bathroom itself, but also the major riser, and sometimes the interfloor pipes. Why is it worth doing so? Old pipes at any time can give a leak, then the new fix will be emptied, it will call for extra investment to get rid of defects.